Protect the performance your capital project was designed to deliver

  • Project teams deliver equipment and information.
  • AMSYST turns that into a plant ready to operate, with structured assets, understood risks, maintenance strategies and essential spares.
  • Ready to execute in your CMMS.

OPERATIONAL ASSURANCE

Your assets must deliver the capacity, reliability, safety and compliance the investment was intended to create.

  • RIGHT ASSET
  • RIGHT STRATEGY
  • READY FOR OPERATION

THE HANDOVER GAP

Mechanical completion is not operational readiness.

By commissioning, the project may have delivered installed equipment, drawings, vendor manuals and as-built records. That does not automatically create a usable maintenance system.

  • Information exists, but is not structured for operations.
  • It remains spread across drawings, spreadsheets, vendor files and project teams.
  • Risks are not translated into maintenance decisions.
  • Criticality, lifecycle, spares and failure-prevention requirements remain disconnected.
  • The CMMS and operating team are not ready when the plant starts.
  • Asset records, work plans and ownership are then built under start-up pressure.

Your business can inherit the assets without inheriting the system needed to protect them.

AMSYST closes the gap between project delivery and sustainable asset performance.

Turn raw project information into an Integrated Maintenance Manual

PROJECT INPUTS

Design

Requirements, specifications, P&IDs and performance assumptions

Procurement

Equipment data, OEM manuals, bills of materials, service and spares recommendations

Installation

As-built data, tags, physical layouts, baseline readings and accessibility requirements

Structure. Assess. Strategise. Implement.

AMSYST converts engineering information into practical, risk-based maintenance decisions.

1

PREPARE ASSET HIERARCHY AND LOCATIONS

2

BUILD RISK PROFILES AND DETERMINE CRITICALITY

3

DEVELOP PM, SPARES & LIFECYCLE STRATEGIES

4

BUILD THE PLANS AND IMPLEMENT IN CMMS

OPERATIONAL OUTPUT

Asset foundation

Asset register, functional hierarchy, technical data, locations and maps

Risk & Strategy

Criticality, Risk profiles, Essential care, PdM & PM programme, essential spares, and lifecycle plans

Executable work

PM Plans, inspection routes, work procedures, and annual schedule

WHY START EARLY

The project is the best time to protect the future operation

The earlier maintenance readiness begins, the more influence you retain and the less knowledge is lost at handover

Influence decisions while change is still practical

Reliability, maintainability, access and equipment-selection issues are easier to resolve before installation and start-up.

Capture knowledge before the project team moves on

Engineering assumptions, vendor details, and commissioning learnings are retained in a usable operational structure.

Start operations with the system already in place

The CMMS, maintenance plans, spares decisions and team ownership are ready before operational pressure takes over.

Do not wait until handover to decide how the plant will be maintained

WHERE AMSYST FITS

Integrated across the project lifecyle

AMSYST works within the normal project flow and progressively turns project information into operational readiness.


1

Feasibility

Performance targets
Maintenance-readiness requirements
EEM delivery plan
Capability and resource needs

2

Design

Reliability reviews
Functional hierarchy
HAZOP support
Access and isolation reviews
Asset-data standards

3

Procurement

TCO and selection input
Vendor-data requirements
Equipment master data
Preliminary BOMs
OEM recommendation review

4

Construction

Installed-asset validation
As-built capture
Defect management
Asset maps
Criticality and strategies

5

Commissioning

Condition baselines
PM/PdM validation
Essential spares
CMMS data testing
Team training

6

Handover

Manual approval
Operational ownership
Plans and schedules live
Performance reviews
Gap closure